Indicative estimate only — not engineering sign-off, warranty, or guarantee of reliability.

← Submount Advisor

Engineering Lab

Co-Design & Engineering Services

Productized engineering for edge-emitter submounts beyond the standard catalog envelope — fixed-scope evaluations, DOE iterations, and long-term platform partnerships.

Not sure which tier? One-time evaluation of a specific idea → Starter Kit. Iterate and run DOE → Co-Design + DOE. Planning a platform or product family → Platform co-development.

Tier 1

Starter Kit Engineering Evaluation

One baseline 3D thermal + stress evaluation (one concept), lifetime/fatigue prediction, pass/fail vs your targets, and written recommendations.

$2,500

2–3 weeks from intake

What's included

  • • Review of your target spec and die layout
  • • Full 3D thermal + stress model (one baseline concept, simulation only — no prototype build)
  • • Lifetime / fatigue prediction vs your cycling profile
  • • Pass/fail report against CTE, Tj, and stress targets
  • • Written recommendations and optional non-final part number

Sample report outline (~10–20 pages)

  1. Executive summary (1 page)
  2. Inputs and target specifications
  3. Thermal stack results (3D model plots)
  4. Stress / fatigue results
  5. Pass/fail vs each target (CTE, Tj, cycling)
  6. Recommended next steps (catalog SKU, custom submount, or DOE)

Example deliverable preview

Pass/fail summary table
(redacted sample)
Thermal stack plot
(redacted sample)
Stress band chart
(redacted sample)

Tier 2

Co-Design + DOE

Multi-concept DOE, iteration loops, prototype support, and test-plan review, building on or beyond a Starter Kit evaluation. NRE/tooling quoted separately.

$250/hr engineering

$10,000 min · NRE/tooling extra

When to use: aggressive targets (100 W on 4 µm stripe, effective CTE ~8, TFLN or special alloys). Or when a Starter Kit shows FAIL but identifies promising directions.

Typical engagement scope

  • • 2–4 design variants
  • • 1 prototype batch
  • • 1–2 test / iteration loops
Work packageDurationOutputs
Kickoff & scopeWeek 1Signed SOW, baseline inputs
Baseline concept modelingWeek 1–2Thermal + stress report v1
Variant exploration (DOE)Week 2–4Design matrix, simulation drops
Prototype batch 1Week 4–6NRE quote, prototype units
Test plan & data reviewWeek 6–8Test summary, iteration plan
Final design freezeWeek 8+Drawings, part number, production quote

Tier 3

Platform co-development

Platform co-development for module families — typically scoped after a Starter Kit or Co-Design DOE engagement.

Examples: co-developing a family of submounts for a new laser module platform, or a standard building block for multiple product lines.

Request a proposal

One form for all tiers — our team will confirm scope and route you to the right engagement.

We'll follow up within 2–3 business days with scope confirmation and a payment link for the Starter Kit.