Free DFM review

Send your submount or package drawing — we respond within 2 business days with feasibility, lead time, MOQ, and risk points. No obligation.

What you get

  • SiC vs ALN material recommendation for your power and CTE requirements
  • Manufacturability go / no-go on pad geometry and metallization
  • Lead time estimate and MOQ confirmation (custom typically 2,000 pcs)
  • Risk flags: thermal path, CTE mismatch, bond pad access

DXF, DWG, Gerber, STEP, PDF, ZIP — max 8 MB per file. Or email to info@ferralink.com.

Response within 2 business days · Custom MOQ typically 2,000 pcs · Ordering details

Frequently asked questions

What do I receive from a FerraLink DFM review?expand_more
Within 2 business days: material recommendation (SiC vs ALN), manufacturability assessment, estimated lead time, MOQ confirmation (typically 2,000 pcs for custom), metallization and CTE flags, and any stack risks we see in your drawing.
Is the DFM review free?expand_more
Yes — no obligation. Submit your drawing via this form or email info@ferralink.com. We respond within 2 business days.
What files should I upload?expand_more
DXF, DWG, Gerber, STEP, or PDF drawing showing submount outline, pad positions, and metallization if known. Include chip size and power/thermal context in the form fields.

Need standard samples instead? Order a sample box · How we work